Our partners and references

Our main goal is to provide a complete, flexible and prompt service in the design and implementation of mobile telecommunications for our clients. We have more than 2 decades of experience in the general construction of mobile base stations for the satisfaction of our customers.

Success stories

Projects we are proud of

Budapest, Sziget Festival

Budapest, Sziget Festival

There is no higher user density anywhere else. We have been installing this local Telenor network since 2010 so we can clearly see the dynamic growth in demand. Currently, 7 base stations can cover the whole area for the period of events with approx. 40 antennas and 90 RRUs. All of them have to be set up within 1 week before the event and there is only 36 hours to dismantle them afterwards. If you want to know more about it please watch the Mobilarena video here: https://www.youtube.com/watch?v=8qOtBB0NnQM

Albertirsa, Warehouse

Albertirsa, Warehouse

GeneralCom was mandated by Vantage Towers to install a new base station for Vodafone. The existing tower on top of the building did not meet the requirements so we decided to change it. Alike the Lakihegy Broadcasting Tower, the new lattice tower leans on a single point on the roof ridge and is tethered by steel cables. The construction status shown in the picture is just temporary and the structure was adjusted to vertical position before On-Air.

Mátraszentimre, Red Rock Lookout Tower

Mátraszentimre, Red Rock Lookout Tower

Coverage had to be provided at that location but the municipality had not permitted regular tower. As a compromise solution we built a beautiful 19th century-style lookout tower which tourists have enjoyed visiting ever since. If you pass by this region, do not forget to have a look: https://maps.app.goo.gl/quyhA4DyRVcGE5Au7

Tatabánya, Monopol tower

Tatabánya, Monopol tower

The existing structures are often no longer strong enough to accommodate newer and newer technologies. That was the case with this Vodafone tower as well which failed the structural analysis for deformation. Therefore, based on an idea come from sailing, the structure was reinforced with steel drawrods.

Törökbálint, Hydroglobus

Törökbálint, Hydroglobus

Telekom and Vodafone were already broadcasting from the water tower when we installed Telenor’s devices. We had to replace the existing structure with a multi-operator one due to lot of antennas to be deployed. The beauty of the task was to do all of this within an extremely short time in order to cause as little inconvenience as possible for the users. Telenor also felt the heaviness of the task so they made their own video about the event: https://drive.google.com/file/d/1mW5mjcZoMjFPde8OzrvLf-C2YqpLEjsS/view

Szentendre, Fire Tower

Szentendre, Fire Tower

As usual, there were already two operators’ equipment on site when Telenor requested us to install their base station. The municipal architect only allowed us to settle in if we concealed all the equipment. Therefore we built a wooden heightening on the ground which we lifted into its place nighttime with a giant crane and a unique lifting boom. This made the task really spectacular, you can watch a short video about it here: https://www.youtube.com/watch?v=xO7vRyQvTG0