There is no higher user density anywhere else. We have been installing this local Telenor network since 2010 so we can clearly see the dynamic growth in demand. Currently, 7 base stations can cover the whole area for the period of events with approx. 40 antennas and 90 RRUs. All of them have to be set up within 1 week before the event and there is only 36 hours to dismantle them afterwards. If you want to know more about it please watch the Mobilarena video here: https://www.youtube.com/watch?v=8qOtBB0NnQM